032F2324
Danfoss 032F2324 - Spare part, EVM NC, Repair kit
- Product Type: Spare part
- Used for product: EVM NC
- Type designation: Repair kit
Product details
| China RoHS compliance | Out of scope | |
| Contain batteries | No | |
| EU RoHS compliance | Out of scope | |
| Packing format | Multi pack | |
| Product group | Solenoid valves spare parts | |
| Product Name Description | Repair kit | |
| Quantity per packing format | 15 pc | |
| REACH Candidate List substances | No | |
| Type | Spare part | |
| Type designation | Repair kit | |
| UK RoHS compliance | Out of scope | |
| Used for product | EVM NC | |
| Product Type | Spare part |
Technical data
| Product type | Solenoid valves spare parts | |
| Net weight | 0.039 kg | |
| Gross weight | 0.09 kg | |
| Packed volume | 0.3 L | |
| EAN | 5702428470810 | |
Documents
Operating guides, design guides, certificates and CAD drawings for 032F2324 are available on request. Ask for documents →